Copy Drawing and Remove Links to Database
The
To copy a drawing and remove all of the links to the database, go to
Ribbon:  →Copy Drawing and Remove Links to Database
Pulldown Menu:
Save Drawing as Dialog Box​
Select a location for the copy, enter a file name, and press the button. A copy of the current drawing will be made using the new name. All of the Design Master Plumbing links to the project database will be removed.
The project database will not be modified during this command.