Skip to main content

Insert Pipe Symbol Project Schedule

A pipe symbol schedule that lists all of the pipe symbols used in the current project can be inserted on the drawing.

To insert the pipe symbol project schedule into the drawing, go to
Ribbon: DM Plumbing→Pipe Symbols→  Insert Pipe Symbol Project Schedule
Pulldown Menu: DM Plumbing→Pipe Symbols→Insert Pipe Symbol Project Schedule

Select Pipe Symbol Group Dialog Box

Select the pipe symbol group to be listed on the schedule and press the button. The Insert Pipe Symbol Project Schedule dialog box will appear.

  •  Schedule Notes: A note that will appear below the schedule when inserted on the drawing.

  •  ☐ Maximum Schedule Height: Whether the schedule has a maximum height. This height corresponds to inches on the printed page.

    If this is not checked, the schedule will be in a single schedule.

    If this is checked, you can specify the maximum height of the schedule. When the schedule exceeds this height, it will be continued in a second schedule next to the first. The label of the second schedule will have the Schedule title continued label option added to it to indicate that it is a continuation of the first schedule. See the Miscellaneous options section for more information.

  •   Press this button to specify the ☐ Maximum Schedule Height on the drawing. The dialog box will be closed and you will be prompted to specify the height.

    Specify maximum schedule height:

    The distance that you enter on the drawing will be used as the maximum height. It is simplest to draw a line straight down to where the bottom of the schedule should be located.

  •  ☐ Zoom to Schedule After Insertion Whether the display will be moved to the schedule location after it has been inserted or updated. Check this box if you are having difficulty locating your schedule on a busy drawing.

  •  ☐ Show Unused Pipe Symbols Whether pipe symbols in the schedule that have not been inserted on a drawing will be displayed in the schedule.

  •   Press this button to modify the layout of the schedule on the drawing. See the Edit Pipe Symbol Schedule List section for more information.

Inserting or Updating the Schedule on the Drawing

To insert or update the schedule, press the button.

Inserting the Schedule the First Time

If the pipe symbol schedule is not currently inserted on the drawing, you will be prompted for the insertion location of the schedule.

Specify insertion point for pipe symbol schedule:

The location you specify will be used as the top-left corner for the pipe symbol schedule.

Updating the Schedule Already on the Drawing

If the pipe symbol schedule is already inserted on the drawing, it will be updated in its current location.

You must update the schedule on the drawing when changes are made to the project schedule. The schedule will not update automatically.

If additional graphics, such as revision clouds, have been inserted over the schedule on the drawing, be sure to check their location after updating the schedule.

Related Options

Schedule title justification: Sets the justification for the schedule title.

Schedule column label justification: Sets the justification for column headings.

Schedule title continued label: Sets the label added to the schedule title for continued sections.