Schedule Labels
This section describes how to customize the layout of schedules on the drawing.
Common Schedule Dialog Box Information
Buttons
-
Move the selected row up in the list. This moves the corresponding schedule column to the left.
-
Move the selected row down in the list. This moves the corresponding schedule column to the right.
Grid Rows
The first row is the schedule title. It cannot be moved. The schedule title always appears at the top of the schedule. The other rows correspond to a column in the schedule. The rows at the top of the list will be displayed on the left of the schedule.
Grid Columns
-
Key ☰ The identifier for the column, describing what value it will display. The value in this column is fixed and cannot be changed.
The Schedule Title key is a special key. The Label of this key is the title of the schedule. The Width and ☐ Display values of this key are ignored. The width of the title is based upon the width of the columns in the schedule. The title is always displayed with the schedule.
-
Label The name that will be displayed for the schedule column.
You can define a second header for a column by separating the two headers with a | character. The first header will be merged across multiple columns with the same first header.
-
Width The width of the column in inches on the printed page.
-
Justification ▾ The justification of the text values in the column. The justification of the title for the schedule and of the column headers are set using the Schedule title justification ▾ options and the Schedule column label justification ▾ option in the Options command.
- Left The text is left-justified.
- Center The text is center-justified.
- Right The text is right-justified.
-
☐ Display Whether the column is shown on the schedule. If this is not checked, the value will not be displayed.
Schedule title justification: Sets the justification for the schedule title.
Schedule column label justification: Sets the justification for column headings.
Schedule title continued label: Sets the label added to the schedule title for continued sections.
📄️ Edit Pipe Symbol Schedule List
To edit the pipe symbol schedule project list, go to
📄️ Edit Pipe Sizing Table Schedule List
To edit the pipe sizing table schedule project list, go to
📄️ Edit Default Schedule Notes
The Edit Default Schedule Notes command is used to set the Schedule Notes field in the Insert Pipe Symbol Project Schedule dialog box for each pipe symbol group.