Import from Project Schedule
The button is used to import records from a project schedule to the master schedule. This button can be used to copy an entire project schedule or a single record. This button allows you to create your master schedule from a project schedule.
When you press this button, the SelectĀ DatabaseĀ toĀ ImportĀ From dialog box will appear and prompt you to select the project from which the schedule records will be imported.
Select the database from which to import. You must select a Design Master Electrical database. The database must be updated to the most current version. If it is not, you will be prompted to open a drawing in the project to convert the database. After it is updated, you will then be able to import from it.After you select the database, the ImportĀ RecordĀ fromĀ AnotherĀ Project dialog box will appear and prompt you to select the records to import.
-
Ā CurrentĀ Group: The group in the project schedule from which the records will be imported.
-
Ā Press this button to select a new group from which to import records.
-
Ā Press this button to import all of the records from the CurrentĀ Group to the master schedule.
New records will be created in the master schedule for each record being imported. If a record with the same name already exists in the master schedule, a new record will be created with (Copy) appended to the record name. The existing record will not be modified.
You will be prompted if you want to delete existing records in the master schedule.
-
Ā RecordĀ ListĀ ā° The list of records in the CurrentĀ Group. Select the records to import from this list. You can select multiple records using the SHIFT and CTRL keys.
-
Ā šĀ CreateĀ NewĀ RecordĀ inĀ Schedule Select this option to create a new record in the master schedule for each record being imported. The record will be created with the same name as the record in the project schedule. If a record with the same name already exists in the master schedule, a new record will be created with (Copy) appended to the record name. The existing record will not be modified.
-
Ā šĀ UpdateĀ CurrentĀ RecordĀ inĀ Schedule Select this option to update the current record in the master schedule with the information from the imported record. All of the information in the master schedule will be overwritten.