Trace Architect's Switches
The
warning
Before using this command, create switches using the Switch Project Schedule command.
This command should be run on the drawing from which you are copying the switch layout. Do not run this command on the drawing you are using for your electrical design.
Both drawings must be in the same folder.
To trace a switch layout, go to
Ribbon:
Pulldown Menu:
The Background Mapper dialog box will appear.
Background Mapper Dialog Box​
See the Trace Architect's Light Fixtures section for more information about how this command works.