Insert Distribution Equipment Schedule

A distribution equipment schedule lists the description, load total summary, and individual circuits and taps for a specific distribution equipment.

To place a distribution equipment schedule on a drawing, go to
Ribbon: DM Electrical→Distribution Equipment→  Insert Distribution Equipment Schedule
Pulldown Menu: DM Electrical→Distribution Equipment Schedules→Insert Distribution Equipment Schedule

Insert Distribution Equipment Schedule Dialog Box​

  •  Distribution Equipment Schedule to Insert ☰ A list of all of the distribution equipment in the database.

Select the schedule to insert and press the button.

Inserting Distribution Equipment Schedules on the Drawing​

You will be prompted to select the insertion point for the distribution equipment schedule.

Insertion point for <distribution equipment name> / <Cancel>:

After you specify the location for the schedule, you will be prompted to insert the schedule for the next distribution equipment in the list.

Insertion point for <distribution equipment name> / <End>:

Continue inserting distribution equipment on the drawing, or press ENTER to finish the command.

warning

The load totals for the distribution equipment are not updated when the schedules are inserted. To calculate these values and update the schedules, use the Update Distribution Equipment Schedule command.

Related Options

Panel schedule load display units: Sets the units used to display loads on panel schedules.

Show fixed number of decimals in panel schedules: Whether all values for loads are displayed with a set number of decimal places. This option can be further customized with the Number of decimals to display in panel schedule option.

Warn if distribution equipment is overloaded: Sets whether a warning dialog box appears while inserting schedules if you have distribution equipment that is overloaded. This option can be further customized with the Distribution equipment overloaded threshold option.

Unused circuit description: Sets how unused circuits are labeled on the schedule.

Include room names in circuit descriptions: Sets whether room names are included in circuit descriptions on the schedule.