Distribution Equipment Schedule Blocks
The
See the General Customization Commands section for more information about how the
To edit the distribution equipment schedule blocks project list, go to
Ribbon:
Pulldown Menu:
To edit the distribution equipment schedule blocks master list, go to
Ribbon:
Pulldown Menu:
Distribution Equipment Schedule Blocks Dialog Box​
-
 Press this button to move the selected block up in the list of blocks.
-
 Press this button to move the selected block down in the list of blocks.
-
 Press this button to create a new block.
-
 Press this button to delete the selected block. If the block is currently used by a record in the schedule, you will be asked if you want to replace the block in the schedule with another block.
-
 Press this button to copy the selected schedule row and blocks. You will be prompted to enter a name for the copy.
-
 Press this button to copy the selected block. You will be prompted to enter a name for the copy.
-
 Press this button to open the drawing for the selected block.
Distribution Equipment Schedule Types​
There are three different types of distribution equipment schedules available. Each type consists of a header block, a footer block, and one or more phase blocks. When a schedule is inserted, these blocks are inserted on the drawing to create the schedule.
The header block is inserted at the top of the schedule. It typically lists the equipment name and the relevant attributes of the equipment, such as the voltage and bus amps.
The footer block is inserted at the bottom of the schedule. It typically includes all of the load totals. These can include totals by phase and the connected and calculated loads by load type.
All schedules have different blocks that are used for single-phase and three-phase distribution equipment. Typically, the only difference is that the single-phase schedules do not list any C-phase loads.
-
 Odd on Left, Even on Right ☰ This schedule type is intended for use with panels. The odd circuits are listed on the left side of the schedule and the even circuits are listed on the right. This schedule type has a phase block for each phase of the schedule. Each phase block should include attributes for two circuits, one from the odd side of the panel and one from the even side.
-
 Odd on Top, Even on Bottom ☰ This schedule type is intended for use with panels. The odd circuits are listed above the even circuits. This schedule type has a phase block for each phase of the schedule. A block is also inserted between the last odd block and the first even block. Each phase block should include attributes for only one circuit. The phase block will be used both above and below the divider for the odd and even circuits.
-
 Taps ☰ This schedule type is intended for use with distribution equipment that is not a panel. This schedule type only has one phase block. One block is inserted for each tap.
Distribution Equipment Schedule Block Settings​
-
 Description ☰ A tree that lists each block group.
The black rows separate the blocks into the three schedule types listed above.
The dark grey rows list each schedule. The value entered in this column will be displayed in the distribution equipment dialog boxes in the Schedule Block ▾ field.
The white rows and yellow rows list the various blocks that make up each schedule. The value displayed in this column describes what the block will be used for in the schedule.
-
 Block Name The block used for the corresponding Description ☰ in the schedule. Values can be set for the white rows and yellow rows.
-
 Default Distribution Equipment Type ▾ The schedule block that is used as the default for each type of distribution equipment. Values can be set for the dark grey rows. Only one schedule block can be chosen for each type of distribution equipment.