Edit Distribution Equipment Master Groups
The
To edit distribution equipment master groups settings, go to
Ribbon:
Pulldown Menu:
Select Distribution Equipment Dialog Box
Select the distribution equipment type to which you want to make changes and press the button. The <Distribution Equipment> Master Schedule Groups dialog box will appear.
<Distribution Equipment> Master Schedule Groups Dialog Box
See the Schedule Groups section for more information about how this dialog box works.
- Press this button to open the Insert <Distribution Equipment> List dialog box.
Insert <Distribution Equipment> List Dialog Box
The Insert <Distribution Equipment> List dialog box is used to change the master database settings for how the selected distribution equipment list is displayed when it is inserted on the drawing.
-
Schedule Notes: A note that will appear below the schedule when inserted on the drawing.
-
☐ Maximum Schedule Height: Whether the schedule has a maximum height. This height corresponds to inches on the printed page.
If this is not checked, the schedule will be in a single schedule.
If this is checked, you can specify the maximum height of the schedule. When the schedule exceeds this height, it will be continued in a second schedule next to the first. The label of the second schedule will have the Schedule title continued label option added to it to indicate that it is a continuation of the first schedule. See the Schedules Options section for more information.
- Press this button to modify the layout of the schedule on the drawing. The Label Display and Order dialog box will appear for the selected distribution equipment list.