Equipment Connections & Panel Schedule Customization
How to create and manage equipment connections, and how to customize panel schedules, in Design Master Electrical.
We look at the following topics for equipment connections:
- The Create Equipment command
- How to customize the available equipment disconnect options
- Configuring equipment connection loads
- Setting breakers and wire size
- Creating equipment on the drawing vs. in the database
- Querying, circuiting, and modifying equipment in the database
- Equipment groups
- Inserting, moving, modifying, and removing equipment callouts
- The Find Equipment on Drawing command
- The Project Explorer command
- The Import Equipment from Another Project command
- Copying individual equipment connections from other projects
We look at the following topics for customizing panel schedules:
- How Design Master schedules are built
- The Distribution Equipment Schedule Blocks command
- Copying schedules and blocks
- The button
- The Insert Distribution Equipment Schedule Attribute command
- The Open Block from Drawing and Redefine Block in this Drawing commands
We also answer the following question:
- "How do you move, add, and remove labels for distribution equipment plan view blocks?"
We also give a brief overview of how the Trace Architect's <Device Type>Â commands work.