Showing Voltage Drop on the First Panel
To show a voltage drop value other than 0% on the first panel in a project, follow these steps:
-
Create an extra panel using the Panels command.
-
With the newly created panel active, press the Schedule and Length Settings button and uncheck the ☐ Show in Voltage Drop Schedule checkbox.
If the new panel will not be used elsewhere in the project, uncheck all of the ☐ Show in... checkboxes.
-
Connect the first panel to the new panel using the Connect Distribution Equipment in Database command.
You can then adjust the settings on the first panel as needed to calculate the voltage drop.